181Anchors Installed·6Storey Building·Aheadof Schedule·2-7/8"Pipe Shaft·1.5"Square Shaft·181Anchors Installed·6Storey Building·Aheadof Schedule·2-7/8"Pipe Shaft·1.5"Square Shaft·

Helical Tieback Anchors
in Maple Ridge

181 Helical Tieback Anchors Installed for Six-Storey Mixed-Use Building, Completed Ahead of Schedule
Maple Ridge, BC
July 2019

While no design drawings for the proposed development were available at the time this report was prepared, we understand that CPA Development Consultants proposed the site may consist of a six-story multi-use building (one floor of concrete construction commercial office space and five floors of wood-frame residential construction) over one level of underground parking. We used Helical Tieback Anchors to build the foundation.

The Challenge

This site presented no real challenges for TerraCana. The only minor challenges faced were due to an extremely dense first meter of ground. As a result this meant the material was installed at a very high torque. Close to the capacity of the grade of steel selected for the project. As a result this provides excellent structural support, but it does require more care and attention from the operator installing.Our scope of work covered the supply and installation of all helical tieback anchors for the South and East elevations. We were able to coordinate with CPA Development Consultants flawlessly and completed the project well in advance of the due date. To provide a complete service, we partnered with Hi-Tide Shoring to complete the shotcrete scope of work.

The Solution

TerraCana completed all helical tieback anchors well in advance of the due date, coordinating flawlessly with CPA Development Consultants and Hi-Tide Shoring.

Technical Specifications

No. of Piles
181
Pile Type
2-7/8 inch pipe shaft or 1.5 inch solid square shaft
Application
Commercial
Schedule
Completed Ahead of Due Date

Key Outcomes

Project completed well in advance of the due date
181 helical tieback anchors installed for South and East elevations
Flawless coordination with CPA Development Consultants and Hi-Tide Shoring

Project Partners

Shotcrete
Hi-Tide Shoring

Equipment

Anchor Installation
CAT 299D

Maple Ridge, BC

Working on a similar project?

Get a quote from TerraCana’s engineering team.

More Projects