3Caisson Foundations·48"Pile Diameter·30'Pile Depth·3Days to Complete·3Person Crew·ZeroDamage to Playing Surface·3Caisson Foundations·48"Pile Diameter·30'Pile Depth·3Days to Complete·3Person Crew·ZeroDamage to Playing Surface·

Langley Events Centre Soccer Scoreboard Foundations

Concrete Filled Caissons Adjacent to the Vancouver FC Soccer Field
Langley, BC
Completed March 31, 2026

The Langley Events Centre required three deep caisson foundations to support a new soccer scoreboard, installed directly adjacent to the soccer field used by Vancouver FC of the Canadian Premier League. TerraCana navigated equipment through a highly landscaped park and active arena environment, completing all three piles in just three days with a three-person crew.

The Challenge

Getting equipment to the work area was the primary challenge. All rigs, materials, and support equipment had to be moved through a highly landscaped park and active arena facility. J.Cote & Sons installed extensive ground protection to minimize damage to the landscaping, and access required careful coordination of deliveries, pickups, and spoils removal.
The work area sat directly against the Vancouver FC soccer field, used by the Canadian Premier League team. Spoils control was critical to protect the playing surface. While the immediate work zone was closed off, the surrounding park and arena remained open and active throughout construction.

Wide shot of yellow drilling rig on ground protection mats beside the Vancouver FC soccer field under overcast skies

The Solution

TerraCana mobilized on a quick turnaround and coordinated closely with J.Cote & Sons and facility staff to manage access and minimize disruption. The team drove three 48-inch diameter pipe piles to 30 feet deep using a Bauer RTG19 vibratory pile rig, then augered out the soils from inside the casings with a SoilMec SR30 before filling with concrete.
Soil conditions were favourable, with soft clay over dense glacial till. The piles were terminated at the till surface, providing a firm bearing layer without needing to penetrate it.
GeoPacific provided geotechnical engineering for the project.

The Outcome

TerraCana completed all three caisson foundations in three days, mobilizing on short notice and maintaining strict spoils control to protect the adjacent Vancouver FC soccer field. The foundations will support the new scoreboard at the Langley Events Centre.

See it in Action

Coming Soon

Technical Specifications

Concrete Filled Caissons
3 piles, 48″ diameter, 30′ depth
Soil Profile
Soft clay over dense glacial till
Installation Duration
3 days
Crew Size
3 TerraCana crew members on site

Key Outcomes

Zero damage to Vancouver FC soccer field
Mobilized on short notice
All three caisson foundations completed in three days

Project Partners

Geotechnical Engineer

Equipment

Casing installation
Bauer RTG19 vibratory pile rig
Soil removal
SoilMec SR30 drill rig